This paper analyzes a real case study based on na islanding power grid, where there is wind power curtailment during the grid operation. This curtailment skews the wind power production database creating a huge challenge to the overall power production forecast. Thus, it is presented a solution whic...
Autor principal: | |
---|---|
Outros Autores: | , |
Formato: | article |
Idioma: | eng |
Publicado em: |
2017
|
Assuntos: | |
Texto completo: | http://hdl.handle.net/10400.21/6890 |
País: | Portugal |
Oai: | oai:repositorio.ipl.pt:10400.21/6890 |
Resumo: | This paper analyzes a real case study based on na islanding power grid, where there is wind power curtailment during the grid operation. This curtailment skews the wind power production database creating a huge challenge to the overall power production forecast. Thus, it is presented a solution which has allowed more accurate forecasts in order to improve the renewable production and reduce the fuel consumption in thermal power plants. The proposed filtering approach demonstrated to be a good solution allowing wind power forecasts with less error and net load forecasts with more accuracy. |
---|