Optimal sizing, scheduling and shift policy of the grinding section of a ceramic tile plant
This paper addresses the optimal design of the grinding section of a ceramic tile plant operating in a cyclic mode with the units (mills) following a batch sequence. The optimal design problem of this single product plant is formulated with a fixed time horizon of one week, corresponding to one cycl...
Autor principal: | |
---|---|
Outros Autores: | , |
Formato: | article |
Idioma: | eng |
Publicado em: |
2008
|
Assuntos: | |
Texto completo: | http://hdl.handle.net/10316/3772 |
País: | Portugal |
Oai: | oai:estudogeral.sib.uc.pt:10316/3772 |