Installation of a Continuous Dynamic Monitoring system at Braga Stadium Suspended Roof: initial results from automated modal analysis

The Braga stadium, constructed for the 2004 European Football Championship, has two grandstands beside the playing area covered by a suspended roof with a span of about 200m. The innovative characteristics of the roof structure have motivated extensive numerical studies during design, dynamic tests...

Full description

Bibliographic Details
Main Author: F. Magalhães (author)
Other Authors: A. Cunha (author), E. Caetano (author)
Format: book
Language:eng
Published: 2009
Subjects:
Online Access:https://hdl.handle.net/10216/96057
Country:Portugal
Oai:oai:repositorio-aberto.up.pt:10216/96057