Installation and results from 18 months of operation of the dynamic monitoring system of Baixo Sabor arch dam

The Baixo Sabor hydroelectric power plant, located in the northeast of Portugal, includes a reservoir with a storage capacity of 630 million m(3) of water created by a concrete double-curvature arch dam, 123 m high, which was equipped with a vibration based structural health monitoring system. This...

ver descrição completa

Detalhes bibliográficos
Autor principal: Álvaro Cunha (author)
Outros Autores: S. Pereira (author), Filipe Magalhães (author), J. Gomes (author), J. V. Lemos (author)
Formato: book
Idioma:eng
Publicado em: 2018
Texto completo:https://hdl.handle.net/10216/125707
País:Portugal
Oai:oai:repositorio-aberto.up.pt:10216/125707