Implementation of a lean six sigma project in a production line

Companies from the motorcycles components branch are dealing with a dynamic environment, resulting from the introduction of new products and the increase of market demand. This dynamic environment requires frequent changes in production lines and requires flexibility in the processes, which can caus...

ver descrição completa

Detalhes bibliográficos
Autor principal: Morais, Valter Rocha (author)
Outros Autores: Sousa, Sérgio (author), Lopes, Isabel da Silva (author)
Formato: conferencePaper
Idioma:eng
Publicado em: 2015
Assuntos:
Texto completo:http://hdl.handle.net/1822/39227
País:Portugal
Oai:oai:repositorium.sdum.uminho.pt:1822/39227
Descrição
Resumo:Companies from the motorcycles components branch are dealing with a dynamic environment, resulting from the introduction of new products and the increase of market demand. This dynamic environment requires frequent changes in production lines and requires flexibility in the processes, which can cause reductions in the level of quality and productivity. This paper presents a Lean Six Sigma improvement project performed in a production line of the company's machining sector, in order to eliminate losses that cause low productivity, affecting the fulfillment of the production plan and customer satisfaction. The use of Lean methodology following the DMAIC stages allowed analyzing the factors that influence the line productivity loss. The major problems and causes that contribute to a reduction on productivity and that were identified in this study are the lack of standardization in the setup activities and the excessive stoppages for adjustment of the processes that caused an increase of defects. Control charts, Pareto analysis and cause-and-effect diagrams were used to analyze the problem. On the improvement stage, the changes were based on the reconfiguration of the line layout as well as the modernization of the process. Overall, the project justified an investment in new equipment, the defective product units were reduced by 84% and an increase of 29% of line capacity was noticed.