D8.1. Report on overall sites infrastructure preparation
The objective of work package WP8 is to ensure a timely preparation and availability of the infrastructures of pilot sites in order to allow the installation of the LITES system. Preparation of the infrastructures is own financing and consequently doesn’t request EC funding. An other objective is to...
Main Author: | |
---|---|
Other Authors: | , , |
Format: | report |
Language: | eng |
Published: |
1000
|
Subjects: | |
Online Access: | http://hdl.handle.net/10773/11866 |
Country: | Portugal |
Oai: | oai:ria.ua.pt:10773/11866 |