D8.1. Report on overall sites infrastructure preparation

The objective of work package WP8 is to ensure a timely preparation and availability of the infrastructures of pilot sites in order to allow the installation of the LITES system. Preparation of the infrastructures is own financing and consequently doesn’t request EC funding. An other objective is to...

Full description

Bibliographic Details
Main Author: Larat, Emmanuel (author)
Other Authors: Delrot, Pascal (author), Avotins, Ansis (author), Alves, Luis Nero (author)
Format: report
Language:eng
Published: 1000
Subjects:
Online Access:http://hdl.handle.net/10773/11866
Country:Portugal
Oai:oai:ria.ua.pt:10773/11866