Productivity improvement of a production line through quick changeover concept – a case study
This paper describes a project that aims at the reduction of setup or changeover times in a final assembly line that produces automotive instrument panels, using the Quick Changeover concept and, methodologies and tools associated with Lean Production. Setup or changeover times are non-productive ti...
Main Author: | |
---|---|
Other Authors: | |
Format: | conferencePaper |
Language: | eng |
Published: |
2018
|
Subjects: | |
Online Access: | http://hdl.handle.net/1822/66663 |
Country: | Portugal |
Oai: | oai:repositorium.sdum.uminho.pt:1822/66663 |