Productivity improvement of a production line through quick changeover concept – a case study
This paper describes a project that aims at the reduction of setup or changeover times in a final assembly line that produces automotive instrument panels, using the Quick Changeover concept and, methodologies and tools associated with Lean Production. Setup or changeover times are non-productive ti...
Autor principal: | |
---|---|
Outros Autores: | |
Formato: | conferencePaper |
Idioma: | eng |
Publicado em: |
2018
|
Assuntos: | |
Texto completo: | http://hdl.handle.net/1822/66663 |
País: | Portugal |
Oai: | oai:repositorium.sdum.uminho.pt:1822/66663 |