BIM-based methodology for the seismic performance assessment of existing buildings
This presents a BIM-based methodology for the seismic performance assessment of existing mixed URM-RC buildings that consists of four phases: (1) Anamnesis, dedicated to the survey and collection of facts about the existing building, the structure and its environs. It aims at a better understanding...
Autor principal: | |
---|---|
Outros Autores: | , , , |
Formato: | conferencePaper |
Idioma: | eng |
Publicado em: |
2020
|
Assuntos: | |
Texto completo: | http://hdl.handle.net/1822/70637 |
País: | Portugal |
Oai: | oai:repositorium.sdum.uminho.pt:1822/70637 |