Sensibility study in a flexible job shop scheduling problem
This paper proposes the impact assessment of the jobs order in the optimal time of operations in a Flexible Job Shop Scheduling Problem. In this work a real assembly cell was studied: the AIP-PRIMECA cell at the Université de Valenciennes et du Hainaut-Cambrésis, in France, which is considered as a...
Main Author: | |
---|---|
Other Authors: | , , |
Format: | conferencePaper |
Language: | eng |
Published: |
2013
|
Subjects: | |
Online Access: | http://hdl.handle.net/1822/63807 |
Country: | Portugal |
Oai: | oai:repositorium.sdum.uminho.pt:1822/63807 |