A meta-heuristic approach to the unit commitment problem under network constraints
Purpose - The purpose of this paper is to solve the problem of committing electric power generators (unit commitment, UC), considering network constraints. Design/methodology/approach - The UC is first solved with a local search based meta-heuristic, following the assumption that all generators and...
Main Author: | |
---|---|
Other Authors: | , , |
Format: | article |
Language: | eng |
Published: |
2008
|
Subjects: | |
Online Access: | https://hdl.handle.net/10216/97681 |
Country: | Portugal |
Oai: | oai:repositorio-aberto.up.pt:10216/97681 |