A meta-heuristic approach to the unit commitment problem under network constraints
Purpose - The purpose of this paper is to solve the problem of committing electric power generators (unit commitment, UC), considering network constraints. Design/methodology/approach - The UC is first solved with a local search based meta-heuristic, following the assumption that all generators and...