Probabilistic life-time oriented multi-objective optimization of bridge maintenance : single maintenance type
The main objective of a bridge manager is to find the best maintenance plan for a group of bridges over a prescribed time horizon. The bridge manager usually faces conflicting ob- jectives, as nlaintenance plans resulting in safer and less deteriorated structures also lead to higher costs. In genera...
Main Author: | |
---|---|
Other Authors: | , |
Format: | article |
Language: | eng |
Published: |
2006
|
Subjects: | |
Online Access: | http://hdl.handle.net/1822/4952 |
Country: | Portugal |
Oai: | oai:repositorium.sdum.uminho.pt:1822/4952 |