Probabilistic life-time oriented multi-objective optimization of bridge maintenance : single maintenance type

The main objective of a bridge manager is to find the best maintenance plan for a group of bridges over a prescribed time horizon. The bridge manager usually faces conflicting ob- jectives, as nlaintenance plans resulting in safer and less deteriorated structures also lead to higher costs. In genera...

Full description

Bibliographic Details
Main Author: Neves, Luís A. C. (author)
Other Authors: Frangopol, Dan M. (author), Cruz, Paulo J. S. (author)
Format: article
Language:eng
Published: 2006
Subjects:
Online Access:http://hdl.handle.net/1822/4952
Country:Portugal
Oai:oai:repositorium.sdum.uminho.pt:1822/4952