Numerical modeling of a large underground powerhouse using geomechanical parameters obtained by artificial intelligence techniques
A large underground hydroelectric scheme is being built as a power reinforcement of an exis-tent scheme completed in 1951 and located in the North of Portugal. This new scheme includes important underground works such as hydraulic circuit with about 4.4km length and two caverns for the powerhouse co...
Autor principal: | |
---|---|
Outros Autores: | , , |
Formato: | conferencePaper |
Idioma: | eng |
Publicado em: |
2004
|
Assuntos: | |
Texto completo: | http://hdl.handle.net/1822/12334 |
País: | Portugal |
Oai: | oai:repositorium.sdum.uminho.pt:1822/12334 |