Numerical modeling of a large underground powerhouse using geomechanical parameters obtained by artificial intelligence techniques

A large underground hydroelectric scheme is being built as a power reinforcement of an exis-tent scheme completed in 1951 and located in the North of Portugal. This new scheme includes important underground works such as hydraulic circuit with about 4.4km length and two caverns for the powerhouse co...

ver descrição completa

Detalhes bibliográficos
Autor principal: Miranda, Tiago F. S. (author)
Outros Autores: Correia, A. Gomes (author), Sousa, L. R. (author), Lima, Celso (author)
Formato: conferencePaper
Idioma:eng
Publicado em: 2004
Assuntos:
Texto completo:http://hdl.handle.net/1822/12334
País:Portugal
Oai:oai:repositorium.sdum.uminho.pt:1822/12334