Multiyear and multi-criteria AC Transmission Expansion Planning model considering reliability and investment costs

One of the major concerns in Power Systems is surely related with their reliability. Long-term expansion planning studies traditionally use the well-known deterministic "N-1" contingency criterion. However, this criterion is applied based on worst-case analyses and the obtained plan may or...

ver descrição completa

Detalhes bibliográficos
Autor principal: João Tomé Saraiva (author)
Outros Autores: Phillipe Vilaça Gomes (author), João Pedro Silva (author)
Formato: book
Idioma:eng
Publicado em: 2016
Assuntos:
Texto completo:https://hdl.handle.net/10216/84387
País:Portugal
Oai:oai:repositorio-aberto.up.pt:10216/84387