Ageing of two 5kW PV arrays at the IES-UPM after 8 years of operation

This work analyses the degradation of two 5 kW PV arrays which are located on the roof of the Campus Sur of the Universidad Politécnica de Madrid. These systems were installed in March 2013 and they have been continuously monitored while they have been injecting power into the grid, storing at the s...

Full description

Bibliographic Details
Main Author: Martínez-Moreno, F. (author)
Other Authors: Rossa, C. (author), Merodio, P. (author), Fialho, L. (author), Tuytyundzhiev, N. (author)
Format: lecture
Language:por
Published: 2021
Subjects:
Online Access:http://hdl.handle.net/10174/30533
Country:Portugal
Oai:oai:dspace.uevora.pt:10174/30533