Going to the core of hard resource-constrained project scheduling instances
The resource-constrained project scheduling problem (RCPSP) is one of the most studied problems in the project scheduling literature, and aims at constructing a project schedule with a minimum makespan that satisfies both the precedence relations of the network and the limited availability of the re...
Autor principal: | |
---|---|
Outros Autores: | |
Formato: | article |
Idioma: | eng |
Publicado em: |
2022
|
Assuntos: | |
Texto completo: | http://hdl.handle.net/10400.2/12598 |
País: | Portugal |
Oai: | oai:repositorioaberto.uab.pt:10400.2/12598 |