Solution methods for an integrated lot sizing and scheduling problem

In this talk we present results of an ongoing study, based on a problem of a textile factory. The core problem is an integrated lotsizing and scheduling one, characterized by sets of parallel machines, arbitrary demands and due dates for products, a compatibility matrix between machines and componen...

ver descrição completa

Detalhes bibliográficos
Autor principal: Pimentel, Carina (author)
Outros Autores: Alvelos, Filipe (author), Carvalho, J.M. Valério de (author), Duarte, António J.S.T. (author)
Formato: conferenceObject
Idioma:eng
Publicado em: 2012
Texto completo:http://hdl.handle.net/10198/7305
País:Portugal
Oai:oai:bibliotecadigital.ipb.pt:10198/7305
Descrição
Resumo:In this talk we present results of an ongoing study, based on a problem of a textile factory. The core problem is an integrated lotsizing and scheduling one, characterized by sets of parallel machines, arbitrary demands and due dates for products, a compatibility matrix between machines and components and release dates of machines. In a solution, the quantities to produce by product/component/size are split among smaller lots, the machines in which those lots will be produced are determined, as well as the order in which they will be done. We present a MIP model and results of a VNS heuristic.