Denysiuk, R., V, M. A., Matos, J. C., Oliveira, J., & Santos, A. (2017). Two-stage multiobjective optimization of maintenance scheduling for pavements.
Chicago Style (17th ed.) CitationDenysiuk, Roman, Moreira André V, José C. Matos, Joel Oliveira, and Adriana Santos. Two-stage Multiobjective Optimization of Maintenance Scheduling for Pavements. 2017.
MLA (8th ed.) CitationDenysiuk, Roman, et al. Two-stage Multiobjective Optimization of Maintenance Scheduling for Pavements. 2017.
Warning: These citations may not always be 100% accurate.