Using AHP and the IPMA Competence Baseline in the project managers selection process

This paper proposes the joint use of the AHP (Analytic Hierarchy Process) and the ICB (IPMA Competence Baseline), as a tool for the decision-making process of selecting the most suitable managers for projects. A hierarchical structure, comprising the IPMA’s ICB 3.0 contextual, behavioural and techni...

ver descrição completa

Detalhes bibliográficos
Autor principal: Varajão, J. (author)
Outros Autores: Cruz-Cunha, M. M. (author)
Formato: article
Idioma:eng
Publicado em: 2016
Assuntos:
Texto completo:http://hdl.handle.net/11110/1119
País:Portugal
Oai:oai:ciencipca.ipca.pt:11110/1119
Descrição
Resumo:This paper proposes the joint use of the AHP (Analytic Hierarchy Process) and the ICB (IPMA Competence Baseline), as a tool for the decision-making process of selecting the most suitable managers for projects. A hierarchical structure, comprising the IPMA’s ICB 3.0 contextual, behavioural and technical competence elements, is constructed for the selection of project managers. It also describes the AHP implementation, illustrating the whole process with an example using all the 46 ICB competence elements as model criteria. This tool can be of high interest to decision-makers because it allows comparing the candidates for managing a project using a systematic and rigorous process with a rich set of proven criteria.