On the multi-mode, multi-skill resource constrained project scheduling problem (MRCPSP-MS)

In this paper we describe an extension of the Resource-Constrained Project Scheduling Problem (RCPSP). A literature review is presented to place our research in its proper context. The problem presented here belongs to the class of the optimization scheduling problems with multi-level (or multi-mode...

Full description

Bibliographic Details
Main Author: Santos, Mónica A. (author)
Other Authors: Tereso, Anabela Pereira (author)
Format: conferencePaper
Language:eng
Published: 2010
Subjects:
Online Access:http://hdl.handle.net/1822/19358
Country:Portugal
Oai:oai:repositorium.sdum.uminho.pt:1822/19358